by Paula Strong | Nov 27, 2017 | Media Releases 2017 |
Stormwater and sewage do not mix – targeting illegal pipe connections East Gippsland Water ; The illegal connection of stormwater pipes into the reticulated sewer system is costing East Gippsland Water, and ultimately customers, some $180,000 a year to address, as... by Paula Strong | Nov 22, 2017 | Media Releases 2017 |
Transforming a pump station with Aboriginal-inspired art East Gippsland Water ; Indigenous students from Federation Training have helped transform the exterior of an East Gippsland Water pump station with Aboriginal-inspired art – working in conjunction with...